阿维诺 Silver & Gold Mines Ltd. (“Avino” or the “Company”) is pleased to announce the completion of the 资源 estimates from the San Gonzalo and 阿维诺 mine systems. Both systems are located on 阿维诺’s property near Durango in west-central 墨西哥. Both mineral 资源 estimates are being compiled in an updated technical report prepared by Tetra Tech, an independent engineering consultant commissioned by 阿维诺.

Below is a summary of current mineral 资源s at the San Gonzalo and 阿维诺 Mines as well as the oxide tailings 资源 (as reported in the July 2012 Technical Report on the 阿维诺 Property) grouped into the measured, indicated and inferred categories. The effective dates of the 资源 estimates are 2013年6月10日 for San Gonzalo and 阿维诺 Mines, while the effective date for the 氧化尾矿 is July 24, 2012, but it is still considered current. The 阿维诺 and San Gonzalo mineral 资源 estimates were prepared by Robert Morrison, Ph.D., P.Geo., while the oxide tailings 资源 was prepared by Mike O’Brien,M.S ..,P.Geo。莫里森博士和O先生’Brien既是Tetra Tech的雇员,又独立于NI 43-101第1.5节所定义的公司。

资源类别存款截止银当量*公吨含金属年级
银 _Eq
(盎司)

(盎司)

(盎司)

(t)
银 _Eq
(克/吨)

(克/吨)

(克/吨)

(%)
实测圣贡萨洛系统15071,416914,791759,8013,288不适用3983311.432不适用
总计测量- All 存款s 71,416914,791759,8013,288不适用    
            
已指示阿维诺 System1004,253,96823,838,62910,835,33872,20730,914174.379.20.5280.727
已指示圣贡萨洛系统150222,4072,763,0692,043,51415,263不适用3862862.134不适用
Total指示-所有存款 4,476,37526,601,69812,878,85287,47030,914    
总计测量&指示-所有存款 4,547,791 27,516,489 13,638,65390,758 30,914     
            
推断阿维诺 System1003,220,89616,262,9447,068,83175,85817,71915768.30.7330.55
推断圣贡萨洛系统1501,085,27610,494,8438,158,83449,549不适用300.8233.81.42不适用
推断氧化尾矿50*234万不适用660万39,530不适用不适用91.30.54不适用
推断总数-所有存款 6,646,17226,757,78721,887,665164,93717,719    

*Ag Eq not calculated for the oxide tailings 资源; cut-off in g/t 银 .

Mineral 资源s which are not mineral 保留s do not have demonstrated economic viability. The estimate of mineral 资源s may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. The quantity and grade of reported 推断 资源s in this estimation are uncertain in nature and there has been insufficient exploration to define these 推断 资源s as an 已指示 or 实测 mineral 资源 and it is uncertain if further exploration will result in upgrading them to the 已指示 or 实测 mineral 资源 category.

“我们对这项研究的结果感到非常满意。我们’ve substantially increased the 资源 at San Gonzalo and have the first ever mineral 资源 estimate on the main 阿维诺 Mine. The 阿维诺 property has an extensive mining history; with this new 资源 estimate and our improving exploration capabilities, 阿维诺 is poised to continue that legacy into the foreseeable future”

大卫·沃尔芬, 总统, CEO and director of 阿维诺 Silver and Gold

圣贡萨洛矿山资源的重点包括:

  • A measured and indicated silver 资源 of 293,823 tonnes at an average grade of 297 g/t silver and 1.98 每克黄金的基本基准品位为150,总计2,803,315金衡盎司银和18,551金衡盎司黄金 g / t银当量。
     
  • An inferred silver 资源 of 1,085,276 tonnes at an average grade of 233.8 g/t silver and 1.42 每克黄金的基本基准截止品位为150,总计白银8,158,834金衡盎司,黄金49,549金衡盎司 g / t(银当量)。

Highlights of the 阿维诺 Mine 资源资源 include:

  • An indicated silver 资源 of 4,253,968 tonnes at an average grade of 79.2 g/t silver, 0.528 每克黄金和0.727%的铜和10,835,338金衡盎司的白银,72,207金衡盎司的金和30,914吨铜的基准价格为100 g / t银当量。
     
  • An inferred silver 资源 of 3,220,896 tonnes at an average grade of 68.3 g/t silver, 0.733 每克黄金和0.55%的铜,总计为7,068,831金衡盎司的银,75,858金衡盎司的黄金和17,719吨的铜,使用的基本截止级别为100 g / t银当量。

San Gonzalo矿山系统:

The 圣贡萨洛矿 estimate was based on data from surface diamond drill programs between 2007 and 2011 (64 holes and 14,624 metres of drilling) and underground development sampling data from levels 1, 2, 3 and 4. Modelling of this data also shows the presence of mineralization for the nearby Angelica vein and its 资源 estimate has been added to those of the San Gonzalo vein.

估算中使用的基本方案假设白银价格为20美元,这意味着截止价格等级为150 在圣贡萨洛的克/吨银当量。当前使用每盎司24.50美元的白银价格分析确定的最低品位为120 g / t(银当量)。自2012年10月开始商业生产以来,Avino一直使用120的截止等级 g / t(银当量)。

A summary of the 资源 at the San Gonzalo mine using different cut off grades is presented below:

资源资源
类别
银 _Eq
隔断

(m3)
公吨密度金属年级
银 _Eq
(盎司)

(盎司)

(盎司)
银 _Eq
(克/吨)

(克/吨)

(克/吨)
测量和
已指示
50163,400425,7642.6064,076,5783,124,27320,199297.8228.21.476
100134,112349,3482.6053,901,4682,987,06319,396347.4265.91.727
120126,688329,3232.5993,830,6392,927,80419,150361.8276.51.809
150113,264293,8222.5943,677,8612,803,31518,550389.3296.81.964
20089,704231,5832.5823,325,4952,528,18216,912446.6339.62.271
25076,672197,5302.5763,079,6882,339,14015,708484.9368.32.473
推断50560,1281,476,1842.63511,899,7909,281,94755,527250.7195.61.170
100512,9201,352,3552.63711,615,0729,055,60154,289267.1208.31.249
120488,9441,289,2402.63711,391,0218,880,11753,259274.8214.21.285
150412,2001,085,2762.63310,494,8438,158,83449,549300.8233.81.420
200296,232779,4842.6318,811,4816,824,18442,153351.6272.31.682
250209,536551,4012.6327,148,5325,508,61334,785403.2310.71.962

Mineral 资源s which are not mineral 保留s do not have demonstrated economic viability. The estimate of mineral 资源s may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. The quantity and grade of reported 推断 资源s in this estimation are uncertain in nature and there has been insufficient exploration to define these 推断 资源s as an 已指示 or 实测 mineral 资源 and it is uncertain if further exploration will result in upgrading them to the 已指示 or 实测 mineral 资源 category.

阿维诺 Mine System:

阿维诺矿山的估算是基于2006年至2012年间地面金刚石钻探计划的数据(钻34孔和11,523米)。还提供了历史采矿信息,以协助对露天矿和地下区域的矿床进行建模,以及将矿床的形状投影到12层以下。 3D线框模型显示存在另一个矿化区,称为“Hanging Wall Breccia” or “Cross 铜tting Vein”. Its 资源 estimate has been included in the 阿维诺 Mine system.

A summary of the 资源 at the 阿维诺 mine using different cut off grades is presented below:

资源资源
类别
隔断
银当量

(m3)
公吨密度金属年级
银 _Eq
(盎司)

(盎司)

(盎司)

(t)
银 _Eq
(克/吨)

(克/吨)

(克/吨)

(%)
已指示503,156,1768,485,8132.68933,698,09514,645,088105,27945,384123.553.70.3860.535
802,113,7605,673,7712.68427,938,36512,390,90086,86736,874153.267.90.4760.650
1001,584,6484,253,9682.68423,838,62910,835,33872,20730,914174.379.20.5280.727
150863,5282,327,4302.69516,205,9417,697,37746,40820,369216.6102.90.6200.875
200405,7921,105,0972.7239,474,1784,522,28327,82811,718266.7127.30.7831.060
250218,048596,5692.7365,820,3742,792,30416,5527,243303.5145.60.8631.214
推断503,316,2728,982,9252.70929,258,35212,407,216130,03133,978101.343.00.4500.378
801,742,6164,710,6332.70320,488,0978,718,18997,19622,668135.357.60.6420.481
1001,193,3203,220,8962.69916,262,9447,068,83175,85817,719157.068.30.7330.550
150519,7041,399,3662.6938,967,6814,229,25429,87810,670199.394.00.6640.763
200204,560552,5622.7014,338,2652,289,3077,3755,539244.2128.90.4151.002
25071,344195,2582.7371,802,9171,022,7432,2842,197287.2162.90.3641.125

Mineral 资源s which are not mineral 保留s do not have demonstrated economic viability. The estimate of mineral 资源s may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. The quantity and grade of reported 推断 资源s in this estimation are uncertain in nature and there has been insufficient exploration to define these 推断 资源s as an 已指示 or 实测 mineral 资源 and it is uncertain if further exploration will result in upgrading them to the 已指示 or 实测 mineral 资源 category.

矿产资源量计算方法
The 阿维诺 system and San Gonzalo system mineral 资源s were modelled and estimated using Datamine™ software version 3.20.6140.0. The reported mineral 资源 was interpolated using ordinary kriging (OK) and capped grades. 阿维诺 mineralization included the interpolation of silver, gold and copper, while San Gonzalo mineralization included the interpolation of silver and gold. Where sufficient data was available, specific gravity (SG) was estimated using OK, otherwise the average estimated value was assigned.

Reported cut-offs utilize a silver equivalent (Ag_Eq) calculation where the total metal value is converted into an in situ silver 资源. For reporting purposes, a base-case 银 _Eq cut-off of 100 g / t用于Avino系统,Ag_Eq截止值为150 g / t用于San Gonzalo系统。根据最近的市场价格,Avino用于财务预测的当前临界值包括80 g / t(用于Avino系统)和120 g / t用于圣贡萨洛系统。

为了计算上述银当量等级,Avino假设银的价格为每盎司20美元,铜的价格为每磅3.66美元,铜的回收率为85%,金的价格为1,507美元。每盎司,金在阿维诺(Avino)矿的回收率为75%,在圣贡萨洛(San Gonzalo)矿的回收率为70%。

The oxide tailings mineral 资源 was estimated using Geovariance Isatis™ software and OK interpolation with uncapped grades. The assay values for this estimate are based on 28 drill holes which were completed on the tailings by CMMA in 1990, and include 407.75 米的钻探和383种金和银测定法。根据Slim(2005d)报告的氧化尾矿的全球平均值,使用了1.605的比重。出于报告目的,白银临界值为50 g/t was used; an 银当量 value was not calculated for the oxide tailings. This mineral 资源 was estimated by Mr. Mike O’Brien,有效日期为2012年7月24日。最初由Tetra Tech(2012)披露,但被认为是最新的。

提高勘探能力

阿维诺 recently purchased Gemcom 3D software and plans to import the new digital database compiled by Tetra Tech during the 资源 calculation process. This new software will allow 阿维诺’在公司之前的2006年至2008年之间收集了4位地质学家来汇编重要的原始数据-包括80公里的IP(诱导极化)地球物理学,1,500份土壤样本,地形,钻孔数据和卫星图像’公司的重心转移到了圣贡萨洛矿山的开发和工厂的翻新。管理层希望使用这项技术找到新的重要钻探目标。该公司拥有两台钻机(一处地面和一处地下),并能够在3D模型完成后对这些新目标以及现有目标进行钻孔。

技术报告归档

阿维诺 will file the Tetra Tech NI 43-101 Technical Report from which the above 资源 numbers were derived, onto the SEDAR website upon receipt within the next 45 days.

合格人员

阿维诺’s projects are under the supervision of Chris Sampson, P.Eng, BSc, ARSM 阿维诺 Consultant and Mr. Jasman Yee, P.Eng, 阿维诺 director, who are both qualified persons within the context of National Instrument 43-101. Both have reviewed and approved the technical data in this news release

About 阿维诺

成立于1968年的Avino’我们的使命是在墨西哥杜兰戈附近的历史悠久的Avino物业中,通过有利可图的有机增长来创造股东价值。我们致力于以对环境负责和具有成本效益的方式管理所有业务活动,同时为我们所在社区的福祉做出贡献。

代表董事会

“David Wolfin”

________________________________
大卫·沃尔芬
总统 & CEO
 

安全港声明-本新闻稿包含“前瞻性信息” and “前瞻性陈述” (together, the “前瞻性陈述”) within the meaning of applicable securities laws and the United States Private Securities Litigation Reform Act of 1995, including our belief as to the extent and timing of various studies including the PEA, and exploration results, the potential tonnage, grades and content of deposits, timing and establishment and extent of 资源s estimates. These 前瞻性陈述 are made as of the date of this news release and the dates of technical reports, as applicable. Readers are cautioned not to place undue reliance on 前瞻性陈述, as there can be no assurance that the future circumstances, outcomes or results anticipated in or implied by such 前瞻性陈述 will occur or that plans, intentions or expectations upon which the 前瞻性陈述 are based will occur. While we have based these 前瞻性陈述 on our expectations about future events as at the date that such statements were prepared, the statements are not a guarantee that such future events will occur and are subject to risks, uncertainties, assumptions and other factors which could cause events or outcomes to differ materially from those expressed or implied by such 前瞻性陈述.

这些因素和假设包括:一般经济状况,金,银和铜的价格,汇率变化和政府当局采取的行动的影响,与法律程序和谈判有关的不确定性以及在准备未来过程中的错误判断。信息。此外,存在已知和未知的风险因素,这些因素可能导致我们的实际结果,业绩或成就与前瞻性陈述所表达或暗示的任何未来结果,业绩或成就发生重大差异。已知的风险因素包括与项目开发相关的风险;需要额外的资金;与采矿和矿物加工有关的操作风险;金属价格的波动;标题事项;与在国外开展业务有关的不确定性和风险;环境责任索赔和保险;依赖关键人员;我们的某些官员,董事或发起人与某些其他项目之间存在潜在的利益冲突;没有股息;货币波动;竞争;稀释;我们普通股价格和交易量的波动性;对美国投资者的税收后果;以及其他风险和不确定性。尽管我们试图确定可能导致实际行动,事件或结果与前瞻性声明中所述的因素有重大出入的重要因素,但可能还有其他因素导致行动,事件或结果与预期,估计或预期的不同。无法保证前瞻性陈述将被证明是准确的,因为实际结果和未来事件可能与此类陈述中的预期存在重大差异。因此,读者不应过分依赖前瞻性陈述。除适用的证券法另有规定外,我们没有义务更新或更改任何前瞻性陈述。

给美国投资者的警告提示-本文所包含的信息和通过引用并入本文的信息是根据加拿大证券法的要求准备的,该要求不同于美国证券法的要求。特别是,“resource”不等于这个词“reserve”。证券交易委员会’s (the “SEC”)披露标准通常不允许包含有关“measured mineral 资源s”, “indicated mineral 资源s” or “inferred mineral 资源s”或其他不构成矿藏的矿化量的描述“reserves” by 美国证券交易委员会 standards, unless such information is required to be disclosed by the law of the 公司’公司注册地或证券交易地。美国投资者也应了解“inferred mineral 资源s”它们的存在有很大的不确定性,其经济和法律可行性也有很大的不确定性。披露“contained ounces” is permitted disclosure under Canadian regulations; however, the 美国证券交易委员会 normally only permits issuers to report mineralization that does not constitute “reserves” by 美国证券交易委员会 standards as in place tonnage and grade without reference to unit measures.

TSX Venture Exchange或其监管服务提供商(该术语在TSX Venture Exchange的政策中定义)均不对此版本的充分性或准确性承担责任。

订阅我们的电子邮件列表

* 表示必填